Frac Sand terminal featuring bolted steel silos, providing a bulk storage capacity of over 12,000 tons of product. This green field project included railroad unloading capacity of 400 tons+ per hour, and the ability to load out 26-ton trucks in less than five minutes each.
Our turn-key solution included four, fully skirted tanks with truck drive through, dual scale system, dust-free load-out equipment, railcar unloading system serving two parallel rail spurs, a bucket elevator with integrated stair tower; and all interface valves, ducting, electrical, concrete, controls interface, motor control center and scale house/control room building.