Soda Ash Process Storage & Rail Load-Out System

PROJECT PROFILE FEATURES

Sodium Bicarbonate process storage and rail load-out system featuring a 2,000 ton fully skirted silo with rail drive through, approach and exit dog house weather enclosures, articulating spout positioner with dust collection and retractable loading spout rated for 200 TPH, mechanical flow inducement, MCC building on upper platform, control room at lower level with inline site for spotting spout, top of rail car access catwalks on both sides, and equipment maintenance platforms. This project was done on a design build basis with provision for a future silo and included: Project management, engineering, equipment, and structural/mechanical site installation with construction management. Process conveying filter receiver, bin vent, and jib crane was provided by customer, and was interfaced and installed by AIS.